MRP Production Date Planned Finished
Shows the Scheduled End Date on Manufacturing Orders, and allows to change the start date from it, through an onchange.
It's useful for companies wanting to plan their manufacturing orders from the target finish date. Usually these companies have long manufacturing times (days or weeks).
auto_awesome What this module does
AI-generated from the code · Odoo 18.0Shows the Scheduled End Date on manufacturing orders and lets you set the start date from it, so you can plan production backwards from the desired finish date.
This module makes the Scheduled End Date visible and editable on manufacturing orders, so planners can work backwards from the date they need the finished product.
- On the manufacturing order form, the Scheduled End Date field is shown (it is normally hidden) and can be edited until the order is done, to close, or cancelled.
- When you change the Scheduled End Date on an order that is not yet planned, Odoo automatically recalculates the Scheduled Start Date by subtracting the manufacturing lead time defined on the bill of materials. If the result would be the same as the end date, it moves the start one hour earlier.
- The scheduled dates of the raw material moves are updated to match the new start date.
- The Scheduled End Date is also available as an optional column in the manufacturing orders list, so you can see it at a glance.
- In the form, the Scheduled End Date is highlighted with warning or danger colours when the start date is already in the past, helping you spot orders that are late or at risk.
It only affects manufacturing orders (mrp.production) and relies on the manufacturing lead time from the bill of materials.
Depends on
Required by other modules
Models and fields (1)
- mrp.production · extends an existing model
Text generated by AI (DeepSeek) from reading the Odoo 18.0 code on GitHub; it may contain mistakes, so check the code before deciding. View the code on GitHub
Availability by version
Reviewed: 2026-11-03Confirmation status: 2 confirmed, 7 with no information of 9 versions.
Sources · Odoo 18.0
Confirmed on 2026-11-03 in branch 18.0 of OCA/manufacture.
terminal Installation and usage
OCA documentation · Odoo 18.0Usage
Source · Odoo 18.0- Go to Manufacturing \> Products \> Bills of Materials and set the Manuf. Lead Time of the BoM you want to plan from the finish date.
- Go to Manufacturing \> Operations \> Manufacturing Orders and create a new manufacturing order.
- Set the Scheduled End date to the desired finish date.
- The Scheduled Date (start) is automatically set to Scheduled End minus the BoM's Manuf. Lead Time, and the dates of the raw material moves are updated accordingly.
The company's Security Lead Time (Manufacturing \> Configuration \> Settings \> Planning) is deliberately not taken into account here: it is a replenishment setting, applied when a reordering rule schedules a manufacturing order, and subtracting it as well would make the order finish before the Scheduled End you asked for.
No verified information in OCA: Installation, Configuration.
Installation instructions, the distribution package, dependencies and configuration steps are not shown because they have not yet been verified in the module documentation for any version.
Data imported from GitHub: this sheet reflects the latest catalog review, not a live lookup. Always check the module documentation and staging before installing in production.